On Monday through Friday, July 26 through 30, Vance Brothers of Kansas City, Missouri will resurface the following City of Salina streets, weather permitting:
11th, Jewel to Kirwin: 26th & 29th
2nd, north of Iron: 26th
Barney, Broadway to Grand: 26th & 29th
Barney, Lincoln to Broadway: 26th
Chapel Ridge north of Magnolia: 28th
Clark, South to Spruce: 26th & 29th
Eileen: 28th
Grand, 9th to 5th: 26th & 29th
Highland, Wayne to Cloud: 28th
Key, Planet to 9th: 28th
Kirwin, Rush to Pershing: 26th & 29th
Quincy, Cloud to Republic: 26th & 29th
Republic Circle: 28th
Republic east of: 27th & 30th
Republic, Osborne to Roach: 27th
Revere: 29th
Seitz, Crawford to Edgehill: 27th & 30th
Westchester: 29th
Local roads will be closed to traffic during construction for a period not to exceed 8 a.m. to 5 p.m. Residents will be provided sufficient notice of closures and special requests will be accommodated. Arterials and collectors will be resurfaced under traffic. Microsurfacing is a common method of pavement surface treatment which consists of a polymer modified asphalt slurry (about 3/8 inch thick) that coats the pavement surface and creates a smooth moisture-resistant barrier. It also increases ride-ability and seals smaller cracks. When combined with proper pavement sealing, micro-surfacing extends the service life of the roadway. Streets are estimated for microsurfacing on a 6 to 8 year cycle at an estimated cost of about $5,000 per block.
The $675,000 project is a major component of the City of Salina's $4.7 million 2021 maintenance capital improvement program. The other roads included in this year’s project are as follows:
July 22 - 24:
12th, Washington to Prescott
Chicago, Spruce to Walnut
Jerry Ivey Park
Melanie, Schilling to Scott
Ray, Schilling to Neal
Sullivan
Not yet scheduled:
2nd, Crawford to Prescott
8th, South to Lincoln
Belmont, Magnolia to Roach
Burr Oak, Ohio to Carolina
Crawford west of I-135
Elmhurst, Ohio to Westbend
Jack
Osborne, Cloud to Claflin
Plantation
Sherman